Accomplishment Report

The Municipal Engineer's Office, headed by Engr. Jose M. Pancrudo, had accomplished and facilitated various projects for upgrading and improvement of infrastructures and other facilities in the municipality. For the first quarter of 2012, the office had embarked on the construction of new building, improvement of offices, and repair and maintenance of public school buildings, day care centers, health stations and farm-to-market roads.

The new LDRRMC Operation Center located at the back of Fire Station Building

We had constructed an office for Pantawid Pamilyang Pilipino Program (4Ps) for the MSWD, a toolroom at Cabatuan Fire Station Building, and an extension building at PNP Headquarters annexed to the municipal hall. Recently, we had finished the construction of LDRRMC Operation Center located at the back of BFP building which will served as headquarters for Local Disaster Risk Reduction Management Council (LDRRMC) and the Cabatuan Responders (CARES). The new building has its own storage room for safekeeping of rescue materials, tools, and other equipment needed in times disasters and calamities.

 

The damaged concrete canopy at the right side of the Cabatuan Hall of Justice building was replaced and repaired while the canopy at Cabatuan Central Elementary School was constructed. In coordination with the Local School Board, the school buildings of Puga Elementary School, APIA Elementary School and Corazon Galindo Primary School were repaired and improved.

 

Other construction projects that we undertook are the concreting of footwalk at municipal cemetery, repair and maintenance of public market, and the construction of steel railings going to Balic Cross at Brgy. Leong. We have started construction of boundary billboard at the access road going to New Iloilo Airport, concreting of municipal equipment garage area at Fire Station Building, construction of conference tables for municipal building, and construction of overflow at Maraguit creek.

 

With the support of Priority Development Assistant Fund (PDAF) of Cong. Arthur R. Defensor Jr., construction and repair of multi-purpose buildings, water systems and barangay roads of fifteen barangays in the municipality are realized.

 

These various projects have improved the working conditions and enhanced our efficiency as government employees, made it more comfortable for the Cabatuananons to avail of LGU services, and spurred economic activity in the municipality.

 

Securing a Building Permit

Securing Building Permit

ABOUT THE SERVICE


A Building Permit is a document issued by the Building Official to an owner/applicant to proceed with the construction, installation, addition, alteration, renovation, conversion, repair, moving, demolition or other work activity of a specific project/building/structure or portions thereof, upon the approval of the accompanying principal plans, specifications and other pertinent documents with the duly notarized application, which will be found satisfactorily and substantially conforming with the National Building Code of the Philippines and its Implementing Rules & Regulations (PD 1096).

 

Under Chapter 3, Sec. 301 of PD 1096, no person, firm or corporation, including any agency of the government is allowed to construct, alter, repair, convert, or cause the same to be done, without first obtaining a building permit from the Building Official assigned in the place where the subject building/structure is located or to be erected.

 

REQUIREMENTS

  1. Any person desiring to obtain a building permit and any ancillary/accessory permits together with a Building Permit shall file application thereof on the prescribed application forms.

  2. Together with the accomplished application form/s, the following shall be submitted to LBO

    Read more: Securing a Building Permit

   

Accomplishment Report

List of Projects Administered and Supervised by the Office:

( July to November 2010 )


a. Implemented Projects:

1. Water Supply System at Covered Gym Facade

2. Painting of Government Structures at Public Plaza

3. Repair of Parola (corner Rizal-Bermejo Sts.)

4. Concrete Footwalk (side of Covered Gym)

5. Writing Table and News Stand (Municipal Building)

6. Painting of Pedestrian Lanes (Poblacion Area)

7. Construction of Sepak Takraw Court (CNCHS)

8. Rehabilitation of Basketball Court (CNCHS)

9. Volleyball Court Extension (CNCHS)

10. Badminton Court (CNCHS)

11. Construction of Sipa Court (CCES)

12. Rehabilitation of Control Tower (CCES)

13. Volleyball Court (CCES)

14. Rehabilitation of Basketball Court (CCES)

15. Construction of School Stage (CNCHS)

16. Wirings for Billeting Room (CNCHS)

17. Replacement of Old Pipelines (CNCHS)

18. Rehablilitation of Comfort Room (CCES)

19. Stainless Water Tank (CCES)

20. Rehabilitation of Electricals (CCES)

 

Read more: Accomplishment Report

   
x

Email Us






Visitors' Counter

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday92
mod_vvisit_counterYesterday222
mod_vvisit_counterThis week92
mod_vvisit_counterThis month3385
mod_vvisit_counterAll days40848

Online Now: 14
Today: May 20, 2012